10 Point Project Management ChecklistChecklist for Avoiding delays in permitting & change orders
1. Zoning information is confirmed at least twice in the preliminary design of the building, preferably by visiting the Zoning Department of the appropriate municipality in person. 2. MEP engineer to check location of water and sewer connections: This avoids finding that the underground pipes are going to go through the footings after the project has started construction. 3. Architectural project manager reviews with structural engineer all beams to making sure that no beams are crossing mechanical ducts and piping. 4. Architectural project manager makes sure that all commercial buildings comply with ADA, UFAS or Fair Housing depending on the applicable code. All doors must have the right distance from the jambs to the perpendicular walls, all thresholds must be less than 1/2” in height, and that all required clearances in front of doors are provided. 5. The first sheet of the architectural drawings of a commercial building describes the Type of Construction which is being used (per Florida Building Code), how many stories, and the Occupancy Type. All the fire walls are to be detailed for the type of construction and the UL number must be stated in the details. 6. All roof flashing conditions must be properly detailed. 7. Architectural, MEP, and civil backgrounds must all match. 8. Required spot elevations are shown on the drawings. 9. Architectural project manager reviews all sections to make sure they match the structural sections, that all architectural dimensions match the structural dimensions. 10. Insulation shown in the plans reflects the insulation values used to generate the energy calculations. |
|||||||||||||||||||||||||
MLC@UnitedArchitectsInc.com |
||||||||||||||||||||||||||